Indicator: Hazardous Waste

Results for this indicator are also available for   [an error occurred while processing this directive]

What the results tell us for Harden

Harden Shire Council has no licence or facility for collection, transport or disposal of hazardous waste or 'controlled' waste as defined in the National Environment Protection Measure (NEPM). Table 1 shows what is known of hazardous waste generation in Harden Shire 2004-2008.

Table 1. Volumes and types of controlled waste collected in Harden Shire, July 2004 – June 2008
  2005-05 2005-06 2006-07 2007-08 Source
Oils No data No data 585 L 846L Various
Putrescible/organic waste 956 tonne     1323 tonne Domestic/commercial/Industrial
Soils/sludge 20 tonne 14.5 tonne 98 tonne 17.1 tonne  

Source: Harden Shire Council

About the data

Harden Shire Council provided information from Shire Council records.

Under NEPM licensing arrangements, private contractors are required to comply with the NEPM for the collection, transportation and disposal of 'controlled' waste. Council has no control over these practices.

The NEPM includes a list of Controlled Wastes which are subject to procedures for information collection and sharing between jurisdictions (see www.ephc.gov.au).

 